Sidebar-Logo-White
(860) 287-5215
miguel@macandd.com
Follow and interact with us on any of our social media outlets below!

WIP Basement 1

Entire basement demo, leaving it down to its framing studs. We updated the electrical and plumbing for the entire basement, as well as a complete reconfiguration and 24 inch expansion to the bathroom. Recessed lighting was installed to brighten up the basement.

  • Drywalled entire basement
  • Plaster
  • Built custom cabinets
  • Installed new toilet, vanity, shower, and bathroom fan

Category:

Work In Progress

Tags:

basement, interior, work in progress